Sign In | Join Free | My tjskl.org.cn
China Cangzhou Weisitai Scaffolding Co., Ltd. logo
Cangzhou Weisitai Scaffolding Co., Ltd.
Stable Quality, Professional Service
Active Member

4 Years

Home > Formwork Clamp >

3.55kg Zinc Plate Scaffold Beam Clamp For Concrete Formwork

Cangzhou Weisitai Scaffolding Co., Ltd.

3.55kg Zinc Plate Scaffold Beam Clamp For Concrete Formwork

  • 1
  • 2

Brand Name : WST

Model Number : FC0011

Certification : CMA ISO

Place of Origin : China

MOQ : 1 piece

Price : Price Negotiation

Payment Terms : L/C, T/T, Western Union,Alibaba trade assurance

Supply Ability : 20 ton/day

Delivery Time : 20-30days

Packaging Details : steel pallet

Material : Ductile casted ironQ450-10

Weight : 3.55kg

Heat treatment : Depends on customers

Usage : Connects panels

Color : Silver galvanized or colorful galvanized

Application : Template building

Contact Now

Scaffolding Concrete Formwork Clamps Timber Beam Form Work Clamp​

Product Overview

Formwork Clamps are used widely during pile cap stage and provide a cheap, effective clamping system that has no nuts or bolts and leaves no expensive ties in the concrete. It is easy to remove and saves cost by using scrap rebar on site as tension rod.

Application:It’s used in fixing column formwork in construction site.

Installation:

First step, join the 4 piece of panel by slots at edge of panel, fix the corner of column formwork by adjustable corner clamp and keep the clamp the same height.

Second step, put the column clamp on the corner clamp, the head of column clamp is fixed into the bent end of column clamp, make sure the column clamp is faced with beam tightly.

Finally, put the wedge pin into column clamp, fix it by hammer, measure the distance between column clamp and keep the clamp the same height, install the resting panel and column clamp by the installation steps.

Dismantling:Hit the end of wedge pin by hammer, remove the steel plate by hands.

Product Parameter

Formwork clamptypes Formwork wedge panel clamp
Sample 3.55kg Zinc Plate Scaffold Beam Clamp For Concrete Formwork
Material Ductile casted ironQ450-10
Weight 3.55KG
Surface treatment Natural ,Painted, Electro galvanized
Colour self color (black), silver galvanized or colorful galvanized
Process Casted iron


Product Advantage

1.Made of excellant casteed iron material,high strength

2.Quick dismantling

3. Reused many times, about 10 years service life

4.Different size,match formwork panels of various size

5.Easy maintenance without rust

There are still many other types of Formwork Clamps in our factory ,welcome to contact us to learn more.

3.55kg Zinc Plate Scaffold Beam Clamp For Concrete Formwork


Product Tags:

Zinc Plate Scaffold Beam Clamp

      

3.55kg Scaffold Beam Clamp

      

3.55kg Formwork wedge panel clamp

      
Quality 3.55kg Zinc Plate Scaffold Beam Clamp For Concrete Formwork for sale

3.55kg Zinc Plate Scaffold Beam Clamp For Concrete Formwork Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Cangzhou Weisitai Scaffolding Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)